免费 · 计算与转换
围栏计算.
按长度和柱距计算立柱、档数和横杆,以及圆孔混凝土。
Posts include both ends. Every bay uses the same rail count. Hole volume is a cylinder and ignores the post itself. Local arithmetic only. This is a quantity or geometry estimate, not a code check and not a substitute for a licensed professional.
- Posts
- 7
- Bays
- 6
- Rails
- 12
Posts are floor(run / spacing) + 1, including both ends. Rails are the bays times the rails per bay. Concrete is a round hole for every post and is omitted when the hole size is zero.
使用方法: 围栏计算
输入数据或选择文件,调整设置并生成结果。复制或下载之前,请检查结果。
限制与支持格式
输入内容在您的设备上处理。
英语技术说明
Posts include both ends. Every bay uses the same rail count. Hole volume is a cylinder and ignores the post itself. Local arithmetic only. This is a quantity or geometry estimate, not a code check and not a substitute for a licensed professional.
Count fence posts, bays and rails from the run and the post spacing, plus concrete for round post holes. Posts include both ends. Every bay uses the same rail count. Hole volume is a cylinder and ignores the post itself. Local arithmetic only. This is a quantity or geometry estimate, not a code check and not a substitute for a licensed professional.
A 12 m run with posts every 2 m and two rails per bay.