免费 · 网络与 IT 基础设施
数据中心能耗与 PUE 计算器.
根据 IT 负载和 PUE 计算设施功率、年耗电量、电费、二氧化碳排放和制冷负荷。
CALCULATED IN YOUR BROWSER · NOTHING IS UPLOADED
About 1.1–1.2 for efficient hyperscale sites, 1.4–1.8 for typical facilities, 2+ for small server rooms.
Use your country’s or supplier’s published factor.
Energy cost per year98,618 USD657.5 MWh
- Facility power
- 75 kW
- Overhead (cooling, UPS losses, lighting)
- 25 kW
- DCiE (1 ÷ PUE)
- 66.7 %
- Cost per month
- 8,218 USD
- Cost of the overhead per year
- 32,873 USD
- Emissions per year
- 263 t CO₂
- Heat from IT equipment
- 170,600 BTU/h · 14.2 tons
- Uses the average IT load over a year (8,766 hours). Peak load sizes cooling and power distribution; average load drives the bill.
- PUE is defined by ISO/IEC 30134-2 and The Green Grid.
使用方法: 数据中心能耗与 PUE 计算器
输入数据或选择文件,调整设置并生成结果。复制或下载之前,请检查结果。
限制与支持格式
输入内容在您的设备上处理。
英语技术说明
Uses one average load and price; tariffs, demand charges and seasonal PUE are not modelled. Everything is calculated in your browser; nothing is sent or probed on the network.
Facility power = IT load × PUE; energy = facility power × 8,766 hours; cost and CO₂ multiply energy by price and emission factor; heat = IT watts × 3.412 BTU/h.
50 kW of IT at PUE 1.5 draws 75 kW, 657.5 MWh a year: about 98,600 USD at 0.15 per kWh.